Matsushita CF-T5LWETZ1 2 Manuel d'utilisateur Page 72

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 104
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 71
72
Line Hold Sheet
After the module is tested, the following work is executed.
The point part of the cable is fixed.
However do not paste the tape on the connector.
SCREW
(DFHE5025XA)
SCREW
(DFHE5025XA)
A
B
LCD Unit
(A) The fingernail in the point part is inserted.
(B) This side is lowered and then engages.
SIMM cover is opened.
Antenna Cover
Screw(DXHM0057ZA) are tightened. (Reuse)
LCD Front
Be parallel after putting.
LCD Rubber
Width : large Width : small
Screws (DXHM0039ZA) are tightened.
LCD Rubbers (DXHM0039ZA) are pasted.
9.3.6.16. Putting Tapes for WWAN Antenna Cable
9.3.6.17. Assembly of the LCD Rear
Vue de la page 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 103 104

Commentaires sur ces manuels

Pas de commentaire